Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 49 results ...

Abdelkhalek, S I (2022) Managing the inspection process of concrete bridge decks, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Aoieong, R T (2004) Capturing quality costs of construction processes using the construction process cost model (CPCM), Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Au, C Y M (2013) An optimal contract strategy in managing extension of time provisions in building contracts, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Bao, Q (2003) Effective energy management during a building's life cycle, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, H L J (2011) Developing a fuzzy risk assessment model for target cost and guaranteed maximum price contracts in the construction industry of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, K C G (2012) The use of virtual reality for visualizing construction safety management process, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, P L (2004) Critical success factors for delivering healthcare projects in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, T S A (2005) The impact of subordinates' professionalism on leadership effectiveness in the construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, W T P (2009) Construction industry development and government policy, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, Y M T (2008) The role of finance in competitiveness of indigenous contractors in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chen, Z (2003) An integrated analytical approach to environmental management in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

  • Type: Thesis
  • Keywords: accuracy; as-built model; measurement; virtual reality; façade; specifications; tunnel; 3D modeling; computer-aided design; excavation; quality control; safety; underground infrastructure; visualization
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/848961369
  • Abstract:
    This research establishes a 3D modeling method based on the mechanism of photogrammetry to ease the effort in providing model ingredients for visualizing main processes and major products in construction operations. Differing from the conventional computer-aided design (CAD) or virtual reality (VR) modeling, the proposed method utilizes a digital camera to capture site images and analytically processes the image data into a 3D model of an object, which largely alleviates the efforts of preparing the design drafts or geometry specifications of the modeling object. A precast façade is modeled under practical constraints to verify the method. The method is useful particularly when the design drafts or geometry specifications of the modeling objects are unavailable or the modeling objects are inaccessible for direct measurement due to safety concerns. The photo-based 3D modeling method provides an alternative to taking geometric measurements on building products. In contrast with the conventional measurement tape, applying photogrammetry is cost-effective and safe as the measurements are conducted on the 3D model of an object resulting from photos, instead of on the object itself. Accordingly, the proposed method is conducive to measuring the building elements situated in hazardous areas and quickly checking the dimensions of prefabricated units on site for quality control purposes. The 95% limits of agreement are established to statistically characterize the accuracy level of the photo-based method against the measurement tape, resulting in [-15. 30 mm, 11. 39 mm]. The engineer makes the final decision on the applicability of the photo-based approach in a particular application. Additionally, this research adapts the analytical algorithms of photogrammetry into a computationally simple yet practical method for incorporating computer-generated 3D as-built graphics of invisible underground infrastructure into site photos, resulting in a richer and more integral view of the site situation. Previous photo-augmenting methods require both the camera's position and orientation to be determined on site. The new method simplifies the superimposition of a view taken from a 3D virtual model onto an actual photo by analytically fixing the camera's orientation with the coordinates of two reference points only, namely, the camera station position and the object focus position. The new approach is applied to superimpose as-built models of infrastructure onto site photos in order to facilitate quality check of bored pile excavation and progress visualization of micro-tunneling construction.

De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Fiona, T S C (2009) A critical study on performance-based fire safety design in Hong Kong with timber perforated ceilings as an example, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Fu, W K (2004) The effect of experience in construction contract bidding, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Hao, J L J (2002) Better use of information: A simulation model for international construction joint ventures in China, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Hong, J (2006) A study on analytic approaches to intelligent buildings assessment, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Huang, T (2009) Virtual prototyping technologies enhanced construction planning, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Kam, C W (2000) Quality assurance of construction works in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lee, L P (2012) Do construction workers accept automated monitoring? A study on the acceptance level and its antecedents, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Leung, W Y (2006) A study of the competitiveness of local contractors in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liang, Y (2006) Integrated IT systems for construction site management, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lin, G (2009) Measuring the performance of value management studies in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liu, G W (2003) A framework for implementing value management in China's construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liu, Y (2009) Critical factors for managing project communication among participants at the construction stage, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Lu, W (2006) A system for assessing and communicating contractors' competitiveness, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Luo, X (2011) A knowledge-based electronic meeting system for implementing value management in construction briefing, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Pan, Y H (2007) Application of industrialized housing system in major cities in China: A case study of Chongqing, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tan, Y (2009) Contractor's competitiveness and competitive strategy in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tang, L (2011) Effective and efficient briefing in public private partnership projects in the construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tse, T-c (2009) The interoperability of building information models and document models in the Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Wang, S Q (1995) A methodology for comparing the productivities of the ready mixed concrete industries in major cities, Unpublished PhD Thesis, Department of Civil and Structural Engineering, Hong Kong Polytechnic University.

Wong, K W J (2007) Development of selection evaluation and system intelligence analytic models for the intelligent building control systems, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Wong, W H (2007) Developing and implementing an empirical system for scoring buildability of designs in the Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yang, C (2004) Knowledge-based understanding and interpretation of construction engineering drawings, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yang, J (2010) A framework for stakeholder management in construction projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yao, H (2009) A dynamic approach for evaluating the sustainability performance of infrastructure projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Ye, K (2009) Modelling competition intensity in construction market, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yuan, H (2011) A dynamic model for assessing the effectiveness of construction and demolition waste management, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Zhang, X (2010) Competitiveness for real estate developers: a China study, Unpublished PhD Thesis, Department of Building and Real Estate, Hong Kong Polytechnic University.